East Peckham Parish Council  ·  Local Development Committee

TMBC's Local Plan: Regulation 19 - our response

The borough's draft Local Plan has reached its final consultation stage. Here is what the village achieved at the last stage, what still concerns us, and exactly what we submitted this time.

Regulation 19  ·  closed 25th October 2026

The village asked. TMBC's plan changed. Now we have asked again.

After the village's objections at the last stage, TMBC's final draft cut East Peckham's housing allocation by more than half. The Parish Council and residents have now responded to that final draft - and every document is on this page.

586 → 228 homes
the allocation cut by more than 60% between the first draft and the final one
3 of 5 parcels
deleted from the plan - including the land with the worst flood risk
7 documents
submitted this time - five Parish Council representations, their evidence, and a residents' response signed by twenty households

The process, in plain English

What is Regulation 19 - and where are we now?

A Local Plan sets out where a borough's housing goes for the next fifteen years. It is prepared in stages - and East Peckham has now been through two of the three big ones.

Done

1  ·  Regulation 18

The early draft - 586 homes for East Peckham. An open consultation where anyone can comment on anything. The village objected in force in December 2025, and the draft changed.

Just closed

2  ·  Regulation 19

The final consultation on the plan TMBC actually intends to adopt - now 228 homes for East Peckham. It ran from 11th September to 25th October 2026. Our responses are in.

Next

3  ·  Examination

An independent planning inspector examines the plan in public - and every Regulation 19 response, including ours, goes directly to them. No date has been set yet.

Regulation 19 responses are different from a normal consultation reply. They are not considered by the borough - they go straight to the inspector, and they must address two specific legal tests: whether the plan is legally compliant, and whether it is "sound" - justified by evidence, effective (that is, deliverable), and consistent with national policy. Objections only carry weight if they show, with evidence, where the plan fails one of those tests. That is why the Parish Council's representations below read like legal documents: they are written for the inspector who will examine the plan.

An unusual backdrop. On 3rd September 2026 TMBC's own Full Council voted to pause the Local Plan, citing concerns about whether enough water supply and other infrastructure exists to support the growth the plan requires. The Government directed TMBC to proceed, and the consultation went ahead - but the borough has put its concerns to the Government in writing. Water supply, as you will see below, is central to East Peckham's case too.

What the village achieved at Regulation 18

The case we made - and the sites that came out

When TMBC consulted on its early draft in December 2025, East Peckham was allocated 586 homes across five parcels of land. The village pushed back - in detail, with evidence, and together.

The Parish Council's formal Regulation 18 response, prepared by the Local Development Committee, set out the case against the allocations site by site: flood risk, the lack of safe access during flooding, a primary school at capacity, no GP surgery or dentist, roads and buses that could not absorb the growth, and water and sewerage networks without the capacity to serve it. Alongside it, residents signed a collective response making the same case in their own words.

When TMBC published its Regulation 19 draft in September 2026, this is what had changed:

Out of the plan - what the village won

  • ✓  Land west of Addlestead Road, Snoll Hatch (site 59613) - deleted
  • ✓  Two parcels south of Church Lane (sites 59789 and 58751) - deleted, including the land with the worst flood risk
  • ✓  The Coult Stream land behind Henham Gardens - now proposed as designated Local Green Space LGS51, a protection the Parish Council asked for
  • ✓  The overall allocation - cut from 586 homes to 228, a reduction of more than 60%

Still in the plan - what remains

  • EP1 - land west of Hale Street and north of Church Lane: 156 homes
  • EP2 - land south of Church Lane: 72 homes

Two sites, 228 homes - still carrying the questions on water, flooding, school places and healthcare that the village has asked from the start. That is why we responded again.

TMBC weighed evidence from many sources in making those changes - but the outcome is the one East Peckham argued for, and it shows that detailed, evidenced responses from a parish and its residents are read, and can change a plan. The village's Regulation 19 response says so plainly: it records the parish's support for the deletions, for LGS51 and for the reduced allocation, and asks the inspector to keep them.

Why we responded again

What still concerns us

A 60% reduction is real progress - but 228 homes on two sites still raises the same fundamental questions the village has asked from the start.

228
homes still allocated to East Peckham on sites EP1 and EP2
244 of 1,400
homes in the parish at flood risk - the highest share of any parish in the borough (Environment Agency, 2025)
0
GP surgeries or dentists in the village - and the primary school is full

The four questions the plan still has not answered

  • Water supply - South East Water has said in writing that it cannot accommodate growth beyond its existing plans in this area, and no scheme yet exists that closes the gap for East Peckham's supply zone.
  • Flood risk - the borough-wide flood sequential test that national policy requires has not been published, in a parish with the borough's highest share of homes at flood risk.
  • Infrastructure - the primary school is full, there is no GP surgery or dentist in the village, and the plan contains no funded, dated solution for either.
  • The evidence itself - the settlement study that scores East Peckham's sustainability contains factual errors, including bus services that do not exist, which the Parish Council corrected in July 2026 and which remain uncorrected.

The representations below do not ask for a village that never changes. They ask for a plan that can actually be delivered - with the water, drainage, school places and safe access to support it - and they ask the inspector to test the evidence before the allocations are confirmed.

Submitted to the Regulation 19 consultation  ·  October 2026

What we submitted

Seven documents went in before the consultation closed - five formal Parish Council representations, the evidence paper behind them, and a collective response from residents. Each is linked here in full.

The Parish Council's representations

PDF
Site EP1 - Land west of Hale Street (156 homes)

Objects to the allocation on seven grounds, including flood risk and the lack of safe access during flooding, a water supply that cannot be evidenced before the mid-2030s, highway bottlenecks on Hale Street, school and healthcare capacity, climate impact, and a major oil pipeline crossing the site.

PDF
Site EP2 - Land south of Church Lane (72 homes)

Objects on eight grounds, including flood risk, water supply, the Green Belt, the loss of best and most versatile farmland, the rejection of adjoining sites on grounds that apply equally here, transport, community infrastructure, and ecology along the Coult Stream corridor.

PDF
Settlement Hierarchy and Spatial Strategy

Challenges the way East Peckham and Hale Street are categorised in the plan's settlement hierarchy. The study behind it contains factual errors - including bus services it credits the village with that do not run - which the Parish Council corrected in July 2026 without the scores being revisited.

PDF
Infrastructure and Utilities

Asks for the East Peckham allocations to be reduced or removed until water, wastewater and community infrastructure capacity is proven, and for the plan's Infrastructure Delivery Plan to tie any housing to binding, dated infrastructure triggers rather than aspirations.

PDF
Topic Paper 7: Utilities and Infrastructure

The parish's own published evidence on water supply, wastewater, energy, digital connectivity and access to services - prepared for the Neighbourhood Development Plan and submitted alongside the Infrastructure and Utilities representation as its evidence base.

PDF
The housing requirement figure (Policy SP2)

TMBC's technical note distributing housing numbers to neighbourhood plan areas - including East Peckham's figure - was not published with the consultation. This representation says the plan cannot be scrutinised, or found sound, while the evidence behind its housing figures is withheld.

“We are not asking for a village that never changes. We are asking for a plan that can be delivered without putting people at risk.”

East Peckham Collective Residents' Response to the Regulation 19 consultation, October 2026

The residents' collective response

PDF
East Peckham Collective Residents' Response (22nd October 2026)

Twenty six residents put their names to a shared response telling the inspector what the plan looks like from the ground: the flooding they live through, the water that cannot be supplied, the bus that does not exist, a village with no doctor and a full school, and homes of the wrong size for the people who need them. It makes eleven practical asks - and records the village's support for the sites already removed, for Local Green Space LGS51 and for the reduced allocation.

All seven documents were submitted to TMBC before the consultation closed at 11.59pm on Monday 26th October 2026, and now go to the independent examiner alongside the plan.

Looking ahead

What happens next

The consultation has closed. TMBC must now submit the plan - together with every representation made - to the Secretary of State for independent examination.

A planning inspector will examine the plan in public and test whether it is legally compliant and sound, taking the representations above into account. The collective residents' response has asked to participate in the examination hearings. It is not yet clear when the examination will take place, or whether and when the plan will be adopted - TMBC has said it will assess the implications for its timetable. We will report what happens on this page.

Meanwhile, the village's own plan continues. The Neighbourhood Development Plan is how East Peckham sets its own policies for the 48 homes the parish must plan for by 2042 - deciding where they go, and what they look like, through a plan the village writes and votes on. The evidence gathered for the NDP is the same evidence that underpinned the representations on this page: each piece of work strengthens the other.

Comments are closed.

Close Search Window
↑