A detail-focused committee that leads on planning and development work for the village. It works through every significant planning matter the Parish Council refers to it, from individual applications to borough-wide consultations.
The committee was set up in early 2022. It sits as a sub-committee of the Parish Council's Planning and Transportation Committee, and draws on a mix of parish councillors and resident volunteers to do the technical work that significant planning matters require.
The Neighbourhood Development Plan is the most significant current project - but it is one piece of a long and continuing record of planning work on behalf of East Peckham.
Scrutinise & respond
Leading detailed responses to significant planning applications and strategic consultations - including the TMBC Local Plan and any borough-wide documents affecting the parish.
Plan & protect
Preparing or advising on planning documents such as the Neighbourhood Development Plan, Housing Needs Assessment, and Local Green Space designations for the parish.
Engage early
Engaging with developers, TMBC and other stakeholders at an early stage to secure community contributions and make sure development preserves and enhances the character of the parish.
Current projects
What the committee is working on
The three active workstreams the LDC is currently leading. Click through each for the full detail.
Neighbourhood Development Plan
The community-led, legally weighted plan for how East Peckham grows. Evidence gathering is well advanced - surveys complete, topic papers published, and a Call for Sites open until 20th November.
Visit the NDP pagesTMBC Local Plan response
The Regulation 18 campaign helped cut East Peckham's allocation from 586 homes to 228. At Regulation 19, the committee prepared five formal representations for the Parish Council, submitted alongside a collective residents' response, now before the independent examiner.
Our Regulation 19 responseSignificant planning applications
The LDC monitors potential proposals and applications that may materially affect the village and advises the Parish Council where a detailed response is needed.
Current applications (TMBC)Track record
Planning work the committee has led
Since 2022, the LDC has led East Peckham's response to every significant planning matter referred to it. Four examples below - each a different challenge, each advancing the village's case.
Westwood Road & Drage Road - footpath registration and infill planning application refusals +
What was at stake
A route between Westwood Road and Drage Road - used by residents for years for walk-throughs and to access garages - was at risk. An infill development proposal on adjacent land would have physically compromised the path and cut off established access. Without formal protection, the route had no guaranteed future.
What the LDC did
The committee worked with residents to formally register the route as a public right of way, putting it on a legal footing that development cannot override. The LDC prepared detailed planning objections for the Parish Council to consider and progress, in relation to two successive applications on the land, setting out the impact on access, amenity and overlooking of neighbouring properties.
Brook Farm Buildings, Church Lane - 60+ home speculative development planning application +
What was proposed
A scheme for more than 60 homes on land at Brook Farm Buildings, Church Lane, originally submitted in December 2021. The application had insufficient sustainable drainage (SuDS) proposals and no meaningful engagement with the local community before or during the application process.
What the LDC did
The committee produced detailed planning objections, working through the technical case on drainage capacity, surface water management, highways impact and the developer's failure to engage with residents. The LDC maintained its position across the original application and subsequent submissions, ensuring the Parish Council's concerns were on the record at every stage.
TMBC Local Plan - Regulation 18 consultation responses (2022 & 2025) +
What was at stake
TMBC's draft Local Plan proposed significant housing allocations for East Peckham. The Regulation 18 consultations were the community's primary opportunity to challenge proposals that raised serious concerns about multiple aspects of the TMBC proposal including development of known flood plains, infrastructure capacity, impact on wildlife and habitats, (and many other areas.) The LDC drafted a detailed technical response on behalf of the Parish Council to deliver the communities views on the formal record, before the TMBC plan progressed.
What the LDC did
The committee led the Parish Council's formal responses to both Regulation 18a (2022) and Regulation 18b (2025), building a detailed case across: surface water flooding and drainage; highway congestion and the lack of safe walking and cycling routes; primary school capacity; healthcare provision; loss of agricultural land; and the overall scale of growth being proposed for a village with East Peckham's infrastructure constraints.
TMBC Local Plan - Regulation 19 representations (2026) +
What was at stake
Regulation 19 is the final public consultation before a Local Plan goes to the Government for independent examination, and responses must address the legal tests of soundness and compliance. The Regulation 19 draft still allocates East Peckham 228 homes on two sites - EP1, land west of Hale Street (156 homes), and EP2, land south of Church Lane (72 homes) - despite unresolved questions on water supply, flood risk, school places and healthcare.
What the LDC did
The committee prepared five formal representations for the Parish Council, each written to the inspector's tests and grounded in the parish's published evidence base: site-by-site objections to EP1 and EP2, a challenge to the settlement hierarchy and the factual errors behind it, an infrastructure and utilities representation supported by the parish's Topic Paper 7, and a representation on the unpublished evidence behind the housing requirement figure. Twenty residents also put their names to a collective residents' response. All were submitted before the consultation closed on 25th October 2026.
The submitted documents:
- Site EP1 - Land west of Hale Street
- Site EP2 - Land south of Church Lane
- Settlement Hierarchy and Spatial Strategy
- Infrastructure and Utilities
- Topic Paper 7: Utilities and Infrastructure (supporting evidence)
- The housing requirement figure (Policy SP2)
- Collective Residents' Response (22nd October 2026)
The committee
Who we are
Up to five parish councillors and twelve resident members may sit on the committee. Currently five councillors and seven residents, giving their time to the detailed work of planning scrutiny.
Parish councillors
- Mark Williams - Chair, Parish Council, LDC
- David Seal - Vice-Chair, Parish Council
- Tracy Hendry-Lewis
Resident members
- Katie White - Vice-Chair, LDC
- Stuart Milligan
- Richard Packham
- Rachel Packham
- Marion Foster
- Daniel White
Governance
On the record
The LDC's meetings are minuted and published. Residents are welcome to attend. All formal records sit with the Parish Council's public documents. The Terms of Reference are under review to be updated in June 2026.
Get in touch
Talk to us
Questions about the committee, any of its current work, or how to get involved? Contact the Parish Office and we'll make sure it reaches the right person. We're volunteers, so replies may not be instant - but they will come.
- Phone 01622 871309
- Hours Mon-Thu, 9:00am-2:30pm
- Email communityresponse@eastpeckham-pc.gov.uk
- Post The Parish Office, Jubilee Hall, Pippin Road, East Peckham, Kent TN12 5BT